Sandbox upgradeMon, Jan 11, 2027Automatic
Production upgradeMon, Mar 15, 2027Automatic
What's changing
This release is about a new interface and a better experience for both sales reps and admins. Product Bundle is now built with Lightning Web Components and the Salesforce Lightning Design System, so its screens look and work like the rest of Salesforce.
Your business data and pricing configuration remain unchanged. Existing Bundles, Bundle Items, Volume Pricing, Attribute Pricing, rules, and transaction line items are preserved. However, Lightning Record Pages and field display configuration must be reviewed after the upgrade.
- Lightning Record Pages instead of Visualforce pages. The primary Product Bundle workflows are now embedded as tabs and components on the Lightning Record Pages (LRPs) for Opportunities, Quotes, Orders, and Bundles. Reps no longer open separate Visualforce pages from custom buttons.
- Field Configuration replaces field sets. The field sets that controlled which fields appear in Product Bundle are retired. The retired Field Sets may remain in the org for reference, but they no longer control the Product Bundle interface. Fields are now set in Field Configuration custom metadata. Packaged Field Configuration records are included for standard functionality. If your organization added custom fields to the retired Field Sets, create corresponding Field Configuration records for those fields. See Field Configuration in the documentation.
After the upgrade: admin steps
No configuration changes are required before the upgrade. However, we recommend documenting your current Field Sets, Lightning Record Page assignments, custom buttons, and Product Bundle customizations before upgrading.
After each environment is upgraded, an admin completes these steps: first in the sandbox after January 11, 2027, and again in production after the scheduled upgrade on March 15, 2027.
- Add and activate the Product Bundle components. Add the packaged components to the Opportunity, Quote, Order, and Bundle Lightning Record Pages. Adding components in Lightning App Builder is not enough: save and activate each page for the correct apps, profiles, record types, and form factors. You can use the packaged record pages, which include the Manage Line Items tab, as examples or assign them directly. See Open Manage Line Items.
- Review Field Configuration. Packaged configurations are provided for standard fields. Recreate any custom-field configuration previously maintained through Field Sets, and verify search, display, cart, summary, grouping, and bulk-edit fields. See Field Configuration, or watch the App Configuration video.
- Review Global Settings. Confirm pricing permissions, bundle expansion, item selection, scheduling, search defaults, and other organization-level behavior. See Global Settings.
- Configure Product Scheduling, if used. Product Scheduling uses the Salesforce REST API and requires an External Client App and Named Credential. Set these up, then enable Establish Scheduling in Global Settings. See Named Credential and Enable Product Scheduling.
- Verify user access. Confirm that users have a Product Bundle package license, the required permission set, Apex class access, and access to the objects and fields used by the new interface. Test with representative sales and administrator users, not only a System Administrator.
- Retire the Visualforce experience. After testing is complete, remove the legacy custom buttons from your page layouts. Old Visualforce pages may also be referenced by flows, links, quick actions, documentation, or other automation, so update those references before removing the buttons.
Need more time? Postpone the production upgrade
Email support@gocpq.com by Monday, March 1, 2027, two weeks before the production upgrade. Please include your company name and your production org ID. Postponing the production upgrade does not affect the sandbox upgrade scheduled for January 11, 2027.